Construction method of single main cable inclined-suspender earth anchored suspension bridge

2010 
The invention discloses a construction method of a single main cable inclined-suspender earth anchored suspension bridge, which is characterized by comprising the following steps of: respectively completing anchoring construction, main tower construction, steel box girder construction, main cable construction and suspender construction, then drawing a front anchor head of a suspender by adopting a jack, and fixing on a steel box girder; regulating the tensile force of the suspender till the tensile force of the suspender and the line shape of a main cable meet the requirements; disassembling all temporary supporting seats, and lowering the steel box girder to a main tower beam as a permanent supporting seat so as to complete the construction. The whole construction process has safety and reliability so as to provide a necessary precondition for ensuring project quality. The construction method has reasonability, high efficiency and concision, can not only ensure the project progress, but also effectively reduce the construction cost.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []