Method for expanding excavation of large-diameter shield tunnel for subway station construction through pile arch wall support
2015
The invention relates to a method for expanding excavation of a large-diameter shield tunnel for subway station construction through a pile arch wall support. The method comprises the steps that a single-hole double-track tunnel of a station portion is used as a part of the station structure, pipe segment structures at the bottom and the top of a shield are reserved, and a bottom longitudinal beam, a middle partition wall and a top longitudinal beam of the station structure are constructed; the remaining station structures on the two sides of the shield tunnel are formed through expanding excavation, an air flue at the end of the station is used as a working plane, expanding excavation is carried out on the two sides of the large-diameter shield tunnel by the adoption of a hole pile method, the pipe segment structures on the two sides of the shield are removed in the expanding excavation process, and meanwhile the connection measure between a cast-in-place structure and the remaining pipe segments is taken to form the single-layer double-span side platform subway station. The method for expanding excavation of the large-diameter shield tunnel for subway station construction through the pile arch wall support has the advantages of being definite in stress, reasonable in conversion, convenient to construct and the like.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI