Optimized flow device eliminates CBM lift equipment, reduces costs
2004
In two examples, about 2.7 MMcf per year of deferred gas production was saved. Considering installed cost, the new equipment paid out in about seven months
Keywords:
- Correction
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI