Influence of stormwater infiltration on the treatment capacity of a LECA-based horizontal subsurface flow constructed wetland

2012 
Abstract This research work evaluates the impact of stormwater infiltration on the removal of organics, solids, nitrogen and phosphorus in a LECA-based horizontal subsurface flow constructed wetland. Stormwater runoff for the period between January 2008 and June 2010 (30 months) was estimated for the drainage basin of the Vila Fernando wastewater treatment plant (constructed wetland system) and it was observed proportionality between the increase in surface runoff and the infiltration flow rate that reached the plant. The average stormwater infiltration rate that reached the plant was 67.4 m 3  d −1 (77% of the influent flow rate into the plant). The 30 month monitoring campaign set up at one of the reed beds showed that stormwater infiltration led to a high variation of the hydraulic loading rate (HLR) throughout the bed, which affected its performance in the removal of organic matter, suspended solids and nitrogen. For a HLR below 20 cm d −1 the removal efficiencies for BOD 5 , COD and TSS doubled. The removal of nitrogen was too low and was associated with the weak development of nitrifying biofilm and the poor growth of reeds. However, it was observed a good relationship between the applied and removed loads for most of the parameters, which seems to indicate that the organic, solid, nitrogen and phosphorus loading rates influenced the respective removal rates. The use of a bed material with high specific surface area, such as LECA, can only improve the treatment capacity of horizontal subsurface flow systems if the organic and solid loading rates, as well as the HLR, can be effectively controlled.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    25
    References
    13
    Citations
    NaN
    KQI
    []