Development of operator assignment schedules: A DSS approach
1994
Being able to generate an operator assignment schedule for a (m) multi-stage, (n) operator production line, with n less or equal to m, and with multiple objectives, is a problem which continues to exist both in the literature and in practice. This paper illustrates how weighted backward dynamic programming and simulation can be combined in a decision support system (DSS) to address such a problem and to evaluate the characteristics of a dynamic production line.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
8
References
12
Citations
NaN
KQI