Development of operator assignment schedules: A DSS approach

1994 
Being able to generate an operator assignment schedule for a (m) multi-stage, (n) operator production line, with n less or equal to m, and with multiple objectives, is a problem which continues to exist both in the literature and in practice. This paper illustrates how weighted backward dynamic programming and simulation can be combined in a decision support system (DSS) to address such a problem and to evaluate the characteristics of a dynamic production line.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    8
    References
    12
    Citations
    NaN
    KQI
    []