ANTWERPEN'S PRE-METRO TAKES SHAPE AS CONSTRUCTION SURGES AHEAD
1980
Stage two of Line 1 opened on March 11 and Line 2 is being constructed using a bentonite shield to bore single-track tunnels one above the other.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI