ANTWERPEN'S PRE-METRO TAKES SHAPE AS CONSTRUCTION SURGES AHEAD

1980 
Stage two of Line 1 opened on March 11 and Line 2 is being constructed using a bentonite shield to bore single-track tunnels one above the other.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []