Highway Construction Productivity Measurement with a Wireless Real-Time Productivity Measurement System

2011 
Improving the quality of construction schedules calls for development of an advanced productivity measurement system. Existing on-site construction productivity measurement methods have some common limitations, such as not providing data necessary for engineers and project managers to conduct real-time analyses and share data with other project participants. A wireless real-time productivity measurement (WRITE) system was developed to address those shortfalls. The field experiment was conducted at two different stages: asphalt paving projects, including hot-mix asphalt and hot-in-place recycling, and a bridge reconstruction project. Productivity data collected from the WRITE system were also compared with productivity data collected from construction documents, such as contractors' daily logs and pay estimate documents, to identify the feasibility of this system for measuring the performance of construction projects. For data analyses, statistical methods such as normality test, paired t-test, and Wilcoxo...
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    17
    References
    7
    Citations
    NaN
    KQI
    []