Effects of Time Shortening on Project Cost in Housing Complex with Different Number of Layers

2012 
In case of Korean housing complex, there became more mixed arrangement of buildings with different number of layers for a variety of urban skyline, recently. For example, around 33% of the construction sites of 'A' public corporation have gaps of more than 4 layers between high-rise buildings and low-rise ones in the same site, according to the survey. Generally, construction duration of the housing complex is estimated based on the layers of the highest building. Due to this baseline, whole construction duration could be extended so that the project cost could be increased. Therefore, framework duration of higher-rise buildings should be reduced to secure the feasibility of the project. On the other hands, these shortenings could adversely harm the feasibility in some cases because there are a wide range of combinations of the buildings with different number of layers in designing housing complex. Therefore, this study shows the results of analysis on effects of framework time shortening on the cost in housing complex project. Moreover, this could set the baseline of checking possibilities in condensing the construction duration of projects with buildings of different layers by supplying comprehensive database.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    1
    References
    0
    Citations
    NaN
    KQI
    []