Instrumentation Report No. 3: performance and reliability of instrumentation deployed for the Spent Fuel Test - Climax

1984 
A demonstration of the short-term storage and subsequent retrieval of spent nuclear fuel assemblies was successfully completed at the US Department of Energy`s Nevada Test Site. Nearly 1000 instruments were deployed to monitor the temperature of rock, air, and metallic components of the test; displacements and stress changes within the rock mass; radiation dosage to personnel and to the rock; thermal energy input; characteristics of the ventilation airstream; and the operational status of the test. Careful selection, installation, calibration, and maintenance of these instruments ensured the acquisition of about 15.3 x 10{sup 6} high-quality data points. With few exceptions, the performance and reliability of the instrumentation and associated data acquisition system (DAS) were within specified acceptable limits. Details of the performance and reliability of the instrumentation are discussed in this report. 42 figs., 32 tabs.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    2
    Citations
    NaN
    KQI
    []