Mathematical Modeling Analysis of Operation Strategy after External Transmission Line Series Compensation

2018 
Nujiang power grid is at the end of the Yunnan power grid, which is the side of power supply. Due to the regional restrictions and the lag of economic development and other factors, the structure of the power grid in Nujiang is relatively weak, and the voltage of the regional power grid is more prominent. Based on analysis on voltage exceeding limits of Nujiang different power grid, combined with the operating characteristics of regional power grid and reactive power compensation measures, this paper proposes measures for adjustment of Nujiang grid voltage, and analyses the result of adjustment of voltage exceeding limits, which can effectively improve the voltage and power quality.