Full-scale operating experience of deep bed denitrification filter achieving <3 mg/l total nitrogen and <0.18 mg/l total phosphorus

2012 
The Arlington County Wastewater Pollution Control Plant (ACWPCP) is located in the southern part of Arlington County, Virginia, USA and discharges to the Potomac River via the Four Mile Run. The ACWPCP was originally constructed in 1937. In 2001, Arlington County, Virginia (USA) committed to expanding their 113,500 m3/d, (300,000 pe) secondary treatment plant to a 151,400 m3/d (400,000 pe) to achieve effluent total nitrogen (TN) to <3 mg/l and total phosphorus (TP) < 0.18 mg/l. Key to this conversion was the implementation of deep bed denitrification filters to simultaneously achieve both low effluent TN and TP concentrations. A challenge with implementing this technology is maintaining a health denitrifying biomass within the denitrification filters while reducing an essential nutrient, phosphorus, to very low concentrations. This paper will review the steps from concept to the first year of operation, including pilot and full-scale operating data and the capital cost for the denitrification filters.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    8
    Citations
    NaN
    KQI
    []