language-icon Old Web
English
Sign In

LINAC 1

The CERN hadron Linacs are linear accelerators that accelerate beams of hadrons from a standstill to be used by the larger circular accelerators at the facility.Linac 1, operating from 1958 until 1992Linac 2, currently used to accelerate protonsLinac 3, currently used to accelerate ionsLinac 4, planned to replace Linac 2 by 2020, will accelerate negative hydrogen ions The CERN hadron Linacs are linear accelerators that accelerate beams of hadrons from a standstill to be used by the larger circular accelerators at the facility. Linac 1 was CERN's first linear accelerator, built to inject 50 MeV protons into the Proton Synchrotron (PS). Conceived in the early 1950s, its principle design was based on a similar accelerator at AERE in England. The first beams were accelerated in 1958, at currents of 5 mA and a pulse length of 20 μs, which was the world record at that time. The accelerator was fully operational by September 1959, when the design energy of 50 MeV was first reached. From then on, Linac 1 experienced a phase of rapid development and constant improve of the output parameters. This culminated in 1978, when a maximal proton current of 70 mA at pulse lengths of 100 μs could be reached. From 1972 on, Linac 1 didn't deliver the protons directly to the PS anymore, but to the Proton Synchrotron Booster (PSB). The PSB had been built to allow for higher energies of the protons beams already before they enter the PS. After Linac 2 had taken over the task of accelerating protons in 1978, Linac 1 continued to be used as a reliable testbed for new developments. This included the testing and implementation of a Radio-frequency quadrupole as the initial accelerator, which replaced the original Cockcroft-Walton generator in 1984. Furthermore, ways to create and accelerate deuterons, α-particles and H− atoms were developed.The latter were used as test beams for LEAR. From late 1986 on, Linac 1 was also used to accelerate oxygen and sulphur ions. Linac 1 ceased to be used in experiments in 1992. In 1963, it was decided to build a new linear accelerator, since Linac 1 was unable to keep up with the technical advances of the other machines within CERN's accelerator complex. Linac 2 replaced Linac 1 as CERN's primary source of proton beams in 1978. It kept the same beam energy, but allowed for more intense beams with beam currents of up to 150 mA and a longer pulse duration of 200 μs. Originally, it had been discussed to further upgrade Linac 1 instead of building a completely new linear accelerator. However, it quickly became clear that the costs of such an update would almost be as expensive as the new Linac 2. Another fact in favor of this new construction was the possibility to ensure a smooth transition from one Linac to the other without any downtime in between. Construction of Linac 2 started in December 1973, with an estimated budget of 21.3 million CHF, and was completed in 1978. Throughout its lifetime, Linac 2 went through several updates to keep up with the advances of CERN's accelerator system. The most important upgrade was the replacement of the old Cockcroft-Walton generator with a Radio-frequency quadrupole in 1993. This raised the output current to 180 mA. Linac 3 was constructed inside the former tunnel of Linac 1 and got commissioned in the summer of 1994. It had been specially constructed to accelerate heavy ions, after tests with Linac 1 and an increasing demand from the scientific community suggested to build a new Linac dedicated specifically to this task. The accelerated particles are mainly lead ions, which are provided to the PSB, LHC and fixed target experiments at the SPS and LEIR. For LEIR's commissioning, also oxygen ions were accelerated.

[ "Linear particle accelerator", "Storage ring" ]
Parent Topic
Child Topic
    No Parent Topic