language-icon Old Web
English
Sign In

Zero Defects

Zero Defects (or ZD) was a management-led program to eliminate defects in industrial production that enjoyed brief popularity in American industry from 1964 to the early 1970s. Quality expert Philip Crosby later incorporated it into his 'Absolutes of Quality Management' and it enjoyed a renaissance in the American automobile industry—as a performance goal more than as a program—in the 1990s. Although applicable to any type of enterprise, it has been primarily adopted within supply chains wherever large volumes of components are being purchased (common items such as nuts and bolts are good examples). Zero Defects seeks to directly reverse the attitude that the number of mistakes a worker makes doesn't matter since inspectors will catch them before they reach the customer.:4 This stands in contrast to activities that affect the worker directly, such as receiving a paycheck in the correct amount. Zero Defects involves reconditioning the worker 'to take a personal interest in everything he does by convincing him that his job is just as important as the task of the doctor or the dentist.':4 The development of Zero Defects is credited to Philip B. Crosby, a quality control department manager on the Pershing missile program at the Martin Company, though at least one contemporary reference credits a small, unnamed group of Martin employees. Zero Defects is not the first application of motivational techniques to production: During World War II, the War Department's 'E for Excellence' program sought to boost production and minimize waste. The Cold War resulted in increased spending on the development of defense technology in the 1950s and 1960s. Because of the safety-critical nature of such technology, particularly weapons systems, the government and defense firms came to employ hundreds of thousands of people in inspection and monitoring of highly-complex products assembled from hundreds of thousands of individual parts.:10 This activity routinely uncovered defects in design, manufacture, and assembly and resulted in an expensive, drawn out cycle of inspection, rework, reinspection, and retest.:12 Additionally, reports of spectacular missile failures appearing in the press heightened the pressure to eliminate defects. In 1961, the Martin Company's Orlando Florida facility embarked on an effort to increase quality awareness and specifically launched a program to drive down the number of defects in the Pershing missile to one half of the acceptable quality level in half a year's time.:12 Subsequently, the Army asked that the missile be delivered a month earlier than the contract date in 1962. Martin marshaled all of its resources to meet this challenge and delivered the system with no discrepancies in hardware and documentation and were able to demonstrate operation within a day of the start of setup.:14¡V15 After reviewing how Martin was able to overachieve, its management came to the conclusion that while it had not insisted on perfection in the past, it had in this instance, and that was all that was needed to attain outstanding product quality.:15 Management commissioned a team to examine the phenomenon and come up with an action plan, which became the organizing, motivating, and initiating elements of Zero Defects.:15 The Department of Defense also took notice and in 1964, began to actively encourage its vendors to adopt Zero Defects programs. Interest in the program from outside firms, including Litton Industries, Thiokol, Westinghouse, and Bendix Corporation,:16 was keen and many made visits to Martin to learn about it.:16 Their feedback was incorporated and rounded out the program. In particular, General Electric suggested that error cause removal be included in the program.:16 Martin claimed a 54% defect reduction in defects in hardware under government audit during the first two years of the program. General Electric reported a $2 million reduction in rework and scrap costs, RCA reported 75% of its departments in one division were achieving Zero Defects, and Sperry Corporation reported a 54% defect reduction over a single year.:17

[ "Operations management", "Quality management", "Marketing", "quality" ]
Parent Topic
Child Topic
    No Parent Topic