language-icon Old Web
English
Sign In

Automated Transfer Vehicle

The Automated Transfer Vehicle, originally Ariane Transfer Vehicle or ATV, was an expendable cargo spacecraft developed by the European Space Agency (ESA) 1995–2007, used for space cargo transport in 2008–2014. The ATV design was launched to orbit five times, exclusively by the Ariane 5 heavy-lift launch vehicle. It functioned much like the Russian Progress cargo spacecraft for carrying upmass to a single destination—the International Space Station (ISS)—but with three times the capacity.Johannes Kepler Automated Transfer Vehicle's launch as seen from the ISSJules Verne Automated Transfer Vehicle approaches the International Space StationATV interior with Expedition 17 crewmembersJules Verne as it re-enters Earth's atmosphere in a controlled burn-up after undocking from ISS—NASA Orion Program managerAn MSS could be used as a small orbital labPARES capsules would be able to hold a few kg of cargoCARV would be used to transport a large amount of cargo to Earth The Automated Transfer Vehicle, originally Ariane Transfer Vehicle or ATV, was an expendable cargo spacecraft developed by the European Space Agency (ESA) 1995–2007, used for space cargo transport in 2008–2014. The ATV design was launched to orbit five times, exclusively by the Ariane 5 heavy-lift launch vehicle. It functioned much like the Russian Progress cargo spacecraft for carrying upmass to a single destination—the International Space Station (ISS)—but with three times the capacity. The five ATVs were Jules Verne, Johannes Kepler, Edoardo Amaldi, Albert Einstein, and Georges Lemaître. Following several delays to the programme, the first of these was launched in March 2008. These ATVs performed supply missions to the ISS, transporting various payloads such as propellant, water, air, food, and scientific research equipment; ATVs also reboosted the station into a higher orbit while docked. It was an uncrewed platform that operated with a high level of automation, such as its docking sequence; at no point was it used for transporting passengers. Further use of the ATV was proposed in 2008. Various further developments, including crewed versions of the ATV as well as opportunities to reuse sections or elements of its technology, were studied by both the ESA and Airbus Defence and Space, the principal manufacturer of the vehicle. However, on 2 April 2012, the ESA announced that the ATV program would be terminated following the launch of the fifth ATV in 2014. In 2012, ESA member states decided that the ATV design might be adapted to serve as the service module of the NASA Orion spacecraft. In January 2013, the ESA and NASA announced that they would proceed with a combined Orion and ATV derived service module, which would serve as a major component for the in-development Orion crewed spacecraft. During the 1990s, as the International Space Station program was taking place, it was collectively recognised by the 15 participating nations that, upon completion, the International Space Station (ISS), a crewed space station in Low Earth orbit (LEO), would require regular resupply missions in order to meet the needs of the onboard crew as well as to deliver apparatus to support the various scientific tests that would be performed on board. In October 1995, it was agreed that, amongst the various contributions to the ISS program that Europe would assume responsibility for under the vestiges of the European Space Agency (ESA), would be the Automated Transfer Vehicle, or ATV; this logistics-orientated spacecraft would perform the identified resupply missions to ISS. On 9 December 1998, the ESA awarded a $470 million contract to proceed with development work on the ATV to French aerospace company Aérospatiale. While Aérospatiale served as the principal contractor for the ATV, it was joined by multiple major subcontractors, including Italian manufacturer Alenia Spazio, Franco-British firm Matra Marconi Space and German aerospace company DaimlerChrysler Aerospace (DASA); some components were also provided by Russian firm S. P. Korolev Rocket and Space Corporation Energia. Prior to 2000, DASA was to serve as the prime contractor for production, after which the role would be gradually transferred to Aérospatiale. At the point at which the contract had been awarded, it was envisioned that the first flight of the ATV would be conducted during September 2003. The launch of the first ATV, which had been named Jules Verne, was subject to multiple delays, which were partially generated by problems encountered with the Ariane 5 heavy-lift launch vehicle, as well as a substantial software re-write. By May 2003, it was set to be launched sometime during late 2004. By mid 2004, it had been announced that launch of the first ATV, which was by then undergoing electrical testing following the completion of integration work, had been postponed due to technical issues, and was reportedly scheduled to be launched during late 2005, following the issuing of a renegotiated $1.1 billion contract between the ESA and the prime contractor. In March 2005, another launch delay was declared, due to the need for greater development of the failure-mode software along with launch-window timing changes, which put the planned ATV launch back from late 2005 to an undetermined date during 2006. In October 2005, it was clarified that the new launch date for the first ATV would be during 2007. In September 2006, it was announced that the final stage of testing on the Ariane 5's customised ATV stage was within its final phase. In December 2006, it was announced that the first ATV had completed its vacuum test, marking the successful completion of the key tests and enabling a final launch date to be set. In April 2007, the ATV was subject to four-month long qualification process in response to operational concerns, including safety queries originating from the U.S., and to examine the vehicle's potential commercialisation. Following multiple restructuring and ownership changes, the prime contractor for the ATV became Airbus Defence and Space, whom lead a consortium of many sub-contractors. While development work had been started in Les Mureaux, France, much of the activity relocated to Bremen, Germany, as the project moved from its development to the production stage, in which work on the four initial units started. In order to facilitate the relationship between the contractor and the ESA, an integrated ESA team at the Les Mureaux site was established and maintained for the duration of the development.

[ "Spacecraft", "Docking (dog)", "International Space Station", "Rendezvous" ]
Parent Topic
Child Topic
    No Parent Topic