language-icon Old Web
English
Sign In

JT-60

JT-60 (short for Japan Torus-60) is a large research tokamak, the flagship of Japan's magnetic fusion program, previously run by the Japan Atomic Energy Research Institute (JAERI) and currently run by the Japan Atomic Energy Agency's (JAEA) Naka Fusion Institute in Ibaraki Prefecture. It is properly an advanced tokamak, including a D-shaped plasma cross-section and active feedback control. JT-60 (short for Japan Torus-60) is a large research tokamak, the flagship of Japan's magnetic fusion program, previously run by the Japan Atomic Energy Research Institute (JAERI) and currently run by the Japan Atomic Energy Agency's (JAEA) Naka Fusion Institute in Ibaraki Prefecture. It is properly an advanced tokamak, including a D-shaped plasma cross-section and active feedback control. First designed in the 1970s as the 'Breakeven Plasma Test Facility' (BPTF), the goal of the system was to reach breakeven, a goal also set for the US's TFTR, the UK's JET and the Soviet T-15. JT-60 began operations in 1985, and like the TFTR and JET that began operations only shortly before it, JT-60 demonstrated performance far below predictions. Over the next two decades, JET and JT-60 led the effort to regain the performance originally expected of these machines. JT-60 underwent two major modifications during this time, producing JT-60A, and then JT-60U (for 'upgrade'). These changes resulted in significant improvements in plasma performance. As of 2018, JT-60 currently holds the record for the highest value of the fusion triple product achieved: 1.77×1028 K·s·m−3 = 1.53×1021 keV·s·m−3. During deuterium (D–D fuel) plasma experiments in 1998, plasma conditions were achieved which would have achieved break-even—the point where the power produced by the fusion reactions equals the power supplied to operate the machine—if the D–D fuel were replaced with a 1:1 mix of deuterium and tritium (D–T fuel). JT-60 does not have the facilities to handle tritium; only the JET tokamak in the United Kingdom has such facilities as of 2018. In fusion terminology, JT-60 achieved conditions which in D–T would have provided a fusion energy gain factor (the ratio of fusion power to input power) Q = 1.25.A self-sustaining nuclear fusion reaction would need a value of Q that is greater than 5. In 2005, ferritic steel (ferromagnet) tiles were installed in the vacuum vessel to correct the magnetic field structure and hence reduce the loss of fast ions.On May 9, 2006, the JAEA announced that the JT-60 had achieved a 28.6 second plasma duration time. The JAEA used new parts in the JT-60, having improved its capability to hold the plasma in its powerful toroidal magnetic field. The main future objective of JT-60 is to realize high-beta steady-state operation in the use of reduced radio-activation ferritic steel in a collision-less regime. It was planned for JT-60 to be disassembled and then upgraded to JT-60SA by adding niobium-titanium superconducting coils by 2010. It is intended to be able to run with the same shape plasma as ITER.:3.1.3 The central solenoid will use niobium-tin (because of the higher (9 T) field).:3.3.1 Construction of the tokamak officially began in 2013, and will continue until 2020 with first plasma planned in September 2020.

[ "Tokamak" ]
Parent Topic
Child Topic
    No Parent Topic